Toe Prep & Frac

Pressure Control From the First Stage

TGFS provides surface pressure control during toe preparation and controlled bleed-off support between frac stages. Experienced personnel monitor equipment and rates while coordinating with the operator, pumping team, and wireline provider.

Rig, trucks and surface equipment on a busy location
[Photo: surface manifold on a frac location]
Row of gate valves on steel piping
[Photo: manifold rig-up during toe preparation]

Completion Support on Location

01

Toe Preparation

Surface manifold rig-up and pressure-control support during sleeve-opening operations, configured around the operator's program.

02

Frac-Stage Support

Controlled bleed-offs and surface pressure management between stages, coordinated with pumping and wireline activity.

Defined Scope. Attentive Execution.

TGFS manages the assigned surface pressure-control scope. Frac pumping and wireline services remain with the providers responsible for those operations.

  • 01Manifold rig-up for the assigned operation.
  • 02Pressure-control support during toe preparation.
  • 03Controlled bleed-offs between frac stages.
  • 04Active equipment and rate monitoring.
  • 05Coordination with the operator and other service providers.

Support Through the Next Stage

Our service offering continues through drill out, flowback and well testing, and production support. Planning the program together helps align equipment needs and operating handoffs.

Discuss Your Completion Program

Share the location, planned sequence, and schedule. Our team will review the surface support required.

Red wellhead assembly behind a railing
[Photo: TGFS personnel on location]